Train schedules are massive distributed coordination problems
Routing hundreds of tons of steel across shared tracks requires precise timing, fail-safes, and signal prioritization to prevent catastrophic collisions. Managing these physical nodes is akin to SRE, where Uptime is a trailing indicator of system health.1
Footnotes
-
Pachl, J. (2002). Railway Operation and Control. VTD Rail Publishing. ↩